Inputs
Orbit
The Equatorial Orbit Designer gives the worst-case eclipse for an altitude.
Loads
Average power drawn in each phase, before contingency; the margin is applied to both.
Power system
Battery
Sized to carry the eclipse load without discharging past the depth-of-discharge limit.
Results
Array
Battery
Orbit budget
Method
The standard orbit-average power sizing: the array output needed to run the loads and recharge the battery through conversion losses, and the battery that carries the eclipse within its depth of discharge.
Derivation
Symbols
| Input | Description | Unit |
|---|---|---|
| T | Orbit period | min |
| Te | Eclipse duration per orbit | min |
| Pd | Sunlit (daylight) load, before margin | W |
| Pe | Eclipse load, before margin | W |
| m | Load margin (contingency) | % |
| Xe | Eclipse path efficiency: array to battery to load | % |
| Xd | Daylight path efficiency: array to load | % |
| Parray | End-of-life array output | W |
| DoD | Allowed depth of discharge | % |
| n | Battery-to-load efficiency | % |
| N | Number of batteries sharing the load | |
| V | Battery voltage | V |
| Derived | Description | Unit |
|---|---|---|
| Td | Sunlit time: T − Tₑ | min |
| Psa | Required array output | W |
| Ee | Energy the batteries supply in eclipse | Wh |
| C | Capacity per battery | Wh |
| CAh | Capacity per battery in amp-hours | Ah |
Reference values
First-order figures for sanity-checking inputs.
| Regulation | Xₑ % | Xd % |
|---|---|---|
| Peak-power tracking | 60 | 80 |
| Direct energy transfer | 65 | 85 |
| Orbit | Eclipse cycles | Typical DoD % |
|---|---|---|
| LEO | ~5,500 per year | 20–30 |
| GEO | ~90 per year | 60–80 |
This is orbit-average sizing after SMAD: one constant load per phase, no peak or pulsed loads, and an array power you supply at end of life. Degradation from radiation, temperature and pointing is not modeled. Battery capacity fade, cycle-life limits and thermal derating are not modeled either, and the depth-of-discharge bands above are starting points; a cell's own cycle-life data sets the real limit. Treat these results as first-pass sizing, not a power subsystem design.